Good morning, Brian
Viewing: All locationsNeeds attention · 16 · All locations
Walk-in cooler #2 (Royal Oak) trending warm — 4 days of drift
Sensor reads 5.8°C at 6 AM, up from 3.9°C Thursday. Three coolers failed same-day in June. → temp log
Equipment
Call vendor
Estevan pay run closes Friday, one clock-out missing
Danielle has no Saturday clock-out. Payworks cut-off is 4 PM Friday and the pre-flight brief is ready. → pre-flight
Payroll
Review
Two Torquay trial shifts unapproved before Friday
7shifts has both waiting on a manager sign-off. Nothing reaches Payworks until they clear. → pre-flight
Payroll
Review
Payworks sync failed twice this morning — session expired
Stopped at the MFA prompt at 5:58 AM. No pay grid was written and nothing was submitted. The pay run closes Friday. → sync log
Integrations
See failure
GST quarterly filing due in 9 days — figure prepared
$14,382 across 3 entities, reconciled to Toast and Sage. Prepared for your review, never filed automatically. → workings
Remittance
Review figure
First Aid coverage gap at Estevan from Sep 4
Sarah M. (certified) departs Sep 4. No other holder on the fall schedule. Nearest course: Aug 18. → coverage matrix
Certs
Book course
Labor at Torquay above target 3 weeks running
31.4% vs 28% target. Leak detector points at Tue–Thu 2–5 PM: two on floor, sales under $190/labor hour. → punches
Labor
See window
Royal Oak food cost at 30.9%, 1.4 pt above July
Protein waste on Tue and Wed covers most of the gap. Recipe costs refreshed to last week's invoices. → variance bridge
Food cost
See items
Royal Oak dish machine past the repair-vs-replace line
$3,120 of repairs against a $5,400 replacement — 58%. Third call in 12 months, all on the pump. → repair history
Equipment
See analysis
Royal Oak sanitizer log missing Thursday and Friday
Dish machine final rinse unlogged both days. The next inspection window opens in 3 weeks. → log
Food safety
Open log
Torquay close at 9 of 13 with 4 business days left
Bank rec and two accruals outstanding. Estevan and Royal Oak are both ahead of this pace. → checklist
Close
Open cockpit
July rent postings prepared, 3 entries awaiting review
Property co. to each operating entity, tied to the current lease schedule. Nothing posts to Sage on its own. → workings
Intercompany
Review entries
Uber Eats portal changed — 3 fields remapped, payout summary held
The connector caught the layout change instead of importing the wrong columns. July close is waiting on that one document. → remap detail
Integrations
Review remap
Sysco raised 4 item prices without notice
Canola +9%, bacon +6%, avocado +11%, 10" clamshells +4%. B&C carries two of them cheaper. → invoice
Suppliers
Compare
Protein trim is 38% of everything wasted this month
$1,180 of $3,120. Royal Oak and Torquay both above the 2.5% standard; Estevan sits at 1.9%. → waste log
Waste
Open log
FOH posting for Estevan should go live by Aug 11
Sarah M. leaves Sep 4 and a new hire needs 3 weeks on the floor first. Draft ad is ready for your review. → staffing radar
Hiring
Open draft
Yesterday · All locations
Location pulse · last 14 days
Trends
Quick panels
Tonight → floor screen
23 reservations
Across 3 locations · pacing OK
Party of 8 — Estevan, 6:30
Regular: the Hendersons · usual table 12
No-show rate, 30 days
4.1% · down from 6.3% since text confirms
Phones, yesterday → call log
61 calls · 9 missed
Peak misses: 12:10–12:50 lunch rush
9 of 9 auto-texted
Hours + ordering link within seconds
$188 recovered
Orders placed from the missed-call text
This morning's advisor note
The rolling two-week daily average at Estevan crossed $3,200 on July 20. The high-volume schedule template applies from next week's build. Fall departures cluster Sep 4–Oct 10 across all three locations; the FOH ad for Estevan should post by Aug 11 to have someone trained before Sarah leaves. GST is prepared and waiting for your review. Tap any number to see the punches, the invoice, or the log behind it.